Build Smart. Build New.

Two construction paths. One trusted team.

Which path is right for you?

Whether you're starting fresh on your own land or transforming a property you already own, we have a solution.

New Home

Modular Construction

Build a brand-new, fully customizable home on your land using Impresa Modular's factory-built construction process. Faster, smarter, and just as permanent as site-built.

  • 1–4 months from delivery to move-in
  • Factory-built precision quality
  • Hundreds of floor plans + custom options
  • Same financing as site-built homes

Existing Property

Rehab & Renovation

Transform an existing property through Concept Containers. Renovations, additions, repairs, and full gut-rehabs for residential and commercial properties across the DMV.

  • 2–6 months depending on scope
  • Builds equity in an existing structure
  • Lower entry cost than new construction
  • Full project management and vendor coordination
Partner Spotlight

What Is Modular Construction?

Modular construction is not manufactured housing. Modular homes are built in sections inside a climate-controlled factory, then transported to your land and set on a permanent foundation — the same foundation as any site-built home.

They meet the same state and local building codes as traditional homes, qualify for conventional financing, and appraise just like any other real property. The difference is in how they're built — and that's where the advantages come in.

Why Build Modular?

Six reasons buyers in the DMV are choosing modular over traditional new construction.

Factory-Controlled Quality

Homes are built in a climate-controlled factory — no weather delays, no inconsistent crews. Every section meets the same high standard every time.

Faster Timeline

Site prep and factory production run in parallel. Most modular homes are set on the foundation and move-in ready in 1–4 months from delivery.

Predictable Pricing

Your home arrives 80–90% complete. Fewer on-site surprises means fewer budget-busting change orders and a cleaner path to closing.

Energy Efficiency

Energy Star options, 2x6 wall framing, and superior insulation packages are standard or available as upgrades. Lower utility bills from day one.

Fully Customizable

Choose from hundreds of floor plans or go custom. Bedrooms, baths, finishes, porches — you design the home, the factory builds it precisely.

Standard Financing

Modular homes qualify for conventional construction-to-perm loans — the same as site-built. No specialty financing required. Same appraisal process.

The Modular Build Process

From first conversation to move-in, here's how a modular home build works — step by step.

1

Build Fit Call

Confirm land, budget, and timeline. Identify financing path and site access feasibility.

2

Design & Select

Choose your floor plan, review options and upgrades, finalize specifications.

3

Plans & Permit

Factory-engineered drawings are submitted for local permits. Plan review and approval.

4

Contract & Deposit

Sign the factory order. 10–35% deposit triggers production scheduling.

5

Production

Factory builds your home while site prep, foundation, and utilities happen simultaneously.

6

Delivery, Set & Finish

Home sections arrive by truck, crane-sets onto the foundation, then site finish wraps in 1–4 months.

Ready to explore a modular home?

Jarvis is a certified Impresa Modular sales consultant serving DC, Maryland, and Virginia. Schedule a free Build Fit Call to confirm your land, budget, and timeline — no obligation.

Schedule a Build Fit Call

Modular vs. Traditional New vs. Rehab

All three paths can build real value. The right choice depends on your land, budget, and timeline.

Modular

Best For:New home on your land with a predictable process
Timeline:3–9 months total (planning + production + finish)

Pros

  • Faster than traditional new builds
  • Factory precision = consistent quality
  • Energy Star options standard
  • Predictable cost — less scope creep
  • Same financing as site-built

Cons

  • Land must be owned or under contract
  • Factory lead time (plan early)
  • Site access needed for delivery trucks + crane

DMV Insight

Modular is code-compliant in DC, MD, and VA. Ideal for infill lots, rural properties, and areas where custom builders don't build.

Traditional New

Best For:Building exactly what you want from scratch on-site
Timeline:8–14 months (depending on permits and complexity)

Pros

  • Everything new
  • Fully customizable on-site
  • Modern energy efficiency
  • No hidden surprises
  • Builder warranty

Cons

  • Higher upfront cost
  • Longest timeline of the three
  • Land acquisition needed
  • Permitting can be lengthy in DC/MD/VA

DMV Insight

Building permits in DC average 4–8 weeks. Montgomery County MD requires green building standards. Fairfax County VA has strict stormwater management requirements.

Rehab

Best For:Transforming an existing property at a lower cost
Timeline:2–6 months (depending on scope)

Pros

  • Lower cost than new build
  • Fastest path to finished property
  • Existing structure and foundation
  • Can add significant equity

Cons

  • Hidden issues (asbestos, lead, outdated wiring)
  • Scope creep is common
  • May need to bring up to current code

DMV Insight

Many DC rowhouses and older MD/VA homes contain lead paint, knob-and-tube wiring, or galvanized pipes. A pre-rehab inspection prevents budget-busting surprises.

Concept Containers

Rehab & Renovation Services

Full-service construction solutions for existing residential and commercial properties across DC, Maryland, and Virginia.

Renovations

Transform existing spaces with modern updates, from kitchens and bathrooms to full home renovations.

New Construction

Ground-up builds designed to your specifications with quality craftsmanship at every stage.

Additions

Expand your living space with room additions, second stories, garages, and more.

Repairs

Professional repair services for structural, electrical, plumbing, and general maintenance needs.

Custom Projects

Unique builds and specialty projects brought to life by our experienced team.

What to Expect During a Rehab

A typical rehab follows these key phases. Knowing what comes next keeps the project on track and on budget.

Pre-Construction

Scope of work finalized, permits pulled, materials ordered

1

Demolition

Selective demo, hazardous material abatement if needed

2

Rough-In

Framing, electrical, plumbing, HVAC ductwork

3

Inspections

County inspections before walls close (critical checkpoint)

4

Finish Work

Drywall, flooring, cabinets, paint, fixtures

5

Final Inspection & Punch List

Walkthrough, touch-ups, certificate of occupancy

6

Ready to Get Started?

Choose your path — we'll take it from there.

Explore Modular Homes

Schedule a free Build Fit Call with Jarvis to discuss your land, budget, and timeline for a modular new home.

Book a Build Fit Call

Start a Rehab Project

Tell us about your renovation or rehab project and get an AI-powered estimate instantly. Upload photos for better accuracy.

Photo & video uploads supported
Get a Rehab Estimate